Lumenand SigenergyCommercial

Commercial energy, engineered to pay its way.

We design and install Sigenergy battery storage and inverters for agricultural and commercial premises across Ireland: farms, warehouses, factories, offices and public buildings. Sized from your meter data by our SEAI-registered engineering team in Athlone.

  • Agricultural, commercial and public buildings
  • 60% TAMS grant on farms
  • SEAI grant on the solar

Accredited & registered Athlone · Installing solar since 2013 (13 years) · 1,000+ installations4.9 from 22 Google reviews

  • SEAI Registered
  • Safe Electric
  • Solar Ireland Member
  • Athlone Chamber

Who it’s for

One platform, from agricultural and commercial to public buildings

Commercial sites use power differently from homes: bigger, earlier, later and in sharper peaks. Sigenergy’s commercial range scales to match, and runs from the same app as everything else.

In-roof solar panels on a restored stone outbuilding at sunset, lanterns glowing on the walls

Agricultural

Dairy, tillage, poultry and pigs

Milking, cooling, water heating, ventilation and lighting, early and late. A battery moves the midday sun to the evening milking. Under TAMS, battery storage is grant-aided alongside the solar.

Agri Solar with Lumen
Aerial view of a builders' merchant, with a run of solar panels down one section of its long roof and timber stacked in the yard

Business

Offices, retail, hotels, manufacturing

Daytime load that lines up with the sun, plus peaks that push against the connection. If you are adding load, a battery can cover the busy hours from stored energy, so you may not need to increase your MIC or pay the charges for going over it.

Commercial solar with Lumen

Public and community

Schools, sports clubs, community buildings

Schools are empty at weekends and in summer; clubs are busiest in the evening. A battery stores the daytime solar so the building uses it and doesn’t export it.

Grants for non-domestic buildings

Made for Ireland and the UK

SigenStack for Irish sites

Sigenergy’s own film on import limits, peak shaving and export-restricted sites: the problems Irish commercial solar runs into first.

SigenStack for commercial solar in Ireland and the UKSigenergy on import limits, peak shaving and export-restricted sites.Film: Sigenergy

SigenStack

Commercial storage that stacks, not sprawls

SigenStack BAT 12.0 modules of 12.06 kWh stack up to 7 high on a footprint smaller than a pallet, and connect straight to a Sigen hybrid inverter. Up to 253 kWh on one inverter, and more inverters in parallel when the site needs it.

The modules plug together with no loose cabling between them, on a level concrete base. Because the battery is DC-coupled to the same inverter as the panels, there is no separate battery inverter or AC combiner, and Sigenergy puts the round-trip gain at up to 2% over AC-coupled storage.

Battery module
12.06 kWh, LiFePO4
Per stack
Up to 7 modules, 84 kWh
Per inverter
4 to 21 modules, up to 253 kWh
Footprint
770 × 363 mm per stack
Rating
IP66, −20 to 55 °C
Cell cycle life
10,000 cycles, cell manufacturer’s test
Charge and discharge
0.5 C nominal, 1 C max
Noise
Under 65 dB, fans speed to suit
SigenStack battery stacks, a Sigen inverter and an Energy Gateway cabinet outside a large commercial building
SigenStack, inverter and gateway on a commercial site. Image: Sigenergy.

Safety built into every module

  • Aerosol fire suppression, a smoke sensor and an exhaust system inside every 12 kWh module
  • Six layers of protection per module: a smoke sensor, full-coverage temperature detection, a high-temperature insulated pad, a heat isolation layer, a pressure relief valve and fire suppression
  • Sealed to IP66, and a faulty module is swapped on its own rather than the whole stack
  • Tested to IEC/EN 62619 and IEC/EN 63056, with UL9540A fire testing

Source: Sigenergy, SigenStack specifications and the SigenStack datasheet, read 11 November 2026.

Size a system

How big a SigenStack?

Choose an inverter and a number of battery modules. Every figure is from Sigenergy’s datasheets and the drawing is to scale. The right size for your site comes from your meter data, and that’s our job at survey.

Sources: SigenStack datasheet, Sigen Hybrid C&I datasheet, read 11 November 2026.

Hybrid inverter
Battery modules
10
Battery energy
120.60 kWh
Stacks
2 5 + 5 modules
Tallest stack
1,943 mm
Stack weight
1,210 kg max
Inverter AC output
110 kW max
Solar it can take
200 kWp

Each stack is 770 mm wide and 363 mm deep. Sigenergy asks for a concrete or other non-combustible base, with 300 mm clear above, 100 mm at the sides and rear, and 1,500 mm in front. The weight is Sigenergy’s figure for a stack with a controller, counted for every stack, so it is the most the row can weigh. One inverter takes 4 to 21 modules. The inverter’s battery charge and discharge rating matches its AC output. For bigger sites, inverters and stacks run in parallel.

Drawn to scale against 1 m and 2 m marks from the ground, in millimetres. All dimensions, weights and spacings shown are estimates, for guidance only. The stacks stand on a concrete base; the darker grey block under each stack is Sigenergy’s own 195 mm base. The main stack, on the right, carries the battery controller; its isolator handle adds 75 mm. The others have a top cover. Stacks are drawn 450 mm apart, as on Sigenergy’s quadruple base, with a cover over the cables that link them. Source: Sigenergy’s SigenStack installation guide, version 07.

What a commercial battery does

Four jobs, one battery

Which one pays depends on your tariff, your connection and when you use power. Most sites get two or three at once. Pick one to see where in the day it works.

More load, without a bigger MIC

Every commercial connection has a Maximum Import Capacity (MIC). When a site grows and its peaks go over it, you either pay the charges for exceeding it or pay ESB Networks to increase it. A battery is the other option. It covers the high-load hours of the day from stored energy and recharges when the site is quiet, so the grid never sees the peak and you may not need to increase your MIC at all.

  • Battery covers the peak
  • Battery recharges
  • Site demand
00:0006:0012:0018:0024:00Maximum Import CapacityCheapPeakExport cap
Illustration of a typical day, not a real site and not to any scale. Your survey uses your own meter data.

What we fit

The Sigenergy commercial range

Inverters from 50 kW up, all-in-one storage for smaller sites, the gateway that ties it together, charging and the cloud platform that runs it. Here’s each one and when we’d use it.

Four white Sigen commercial inverters mounted on a rooftop wall above rows of solar panels

50 – 125 kW, battery ready

Sigen Hybrid C&I inverter

The three-phase commercial inverter that runs the panels and the SigenStack battery together. The HYB version adds a backup port for chosen loads.

Sizes
50, 60, 80, 100, 110 and 125 kW
Solar input
Up to 220 kWp, 4 to 8 MPPTs
Max efficiency
98.6%
Rating
IP66, 1,100 V DC, arc-fault detection

When we use it: Most commercial and farm systems with storage, now or planned.

Sigenergy’s specifications for Sigen Hybrid C&I inverter
A Sigen commercial inverter beside a solar array, with arrows showing air flowing through it

Solar now, storage later

Sigen PV inverter

The solar-only version of the same platform, up to 166.6 kW. The 50 – 125 kW models keep a port reserved, so SigenStack can be added later.

Sizes
50 – 125 kW, plus 150 and 166.6 kW
Solar input
Up to 270 kWp on the largest
Scale
Up to 100 units in parallel, built-in EMS
Rating
IP66, 98.6% max efficiency

When we use it: Large roofs and farm sheds where the battery comes in a second phase.

Sigenergy’s specifications for Sigen PV inverter
A white SigenStor stack, lit from below against a dark background

For smaller sites

SigenStor three phase

The all-in-one stack from our home range in its three-phase business sizes: inverter, battery and energy management in one, up to 30 kW.

Controller sizes
5 – 30 kW three phase
Battery
Up to 54.24 kWh per controller
Solar input
Up to 48 kW on the 30 kW model
Rating
IP66

When we use it: Small farms, shops, offices and clubs, and anywhere DC car charging is wanted.

Sigenergy’s specifications for SigenStor three phase
A white car charging from a wall-mounted Sigen EV AC Charger in a bright garage

Fleet and visitor charging

Sigen EV chargers

AC chargers at 7, 11 or 22 kW for staff, visitors and fleets, and a 12.5 or 25 kW V2X-ready DC module that fits on a SigenStor stack.

AC
7, 11 or 22 kW, Type 2
DC
12.5 or 25 kW, CCS2, with SigenStor
DC control
OCPP 1.6J, RFID or app
Rating
IP66 (DC)

When we use it: Most commercial and domestic situations.

Sigenergy’s specifications for Sigen EV chargers

From one inverter to many

Sigen Energy Gateway (C&I)

The cabinet that ties several hybrid inverters together, with zero-export control, a generator port and switchover to backup.

Sizes
600 kW and 1,200 kW, up to 2.4 MW modular
Export control
Zero export within 100 ms
Backup switchover
0 ms
Also
Diesel generator port

When we use it: Larger sites with more than one inverter, export limits, or loads that must ride through a power cut.

Sigenergy’s specifications for Sigen Energy Gateway (C&I)

Monitoring and control

Sigen Cloud

One view of every inverter, stack and charger on the site, with peak shaving and Sigen AI Mode scheduling the battery around your tariff.

Data
Updates every 10 seconds
Open
Third-party devices, VPP and API integration

When we use it: Every commercial system we fit. We monitor it with you.

Sigenergy’s specifications for Sigen Cloud

Figures from Sigenergy’s product pages and datasheets, read 11 November 2026. Images: Sigenergy. Looking for a home system? See Sigenergy for homes.

How Lumen does it

The hardware is only as good as the installation

Sigenergy makes the hardware. Engineering it to your site, installing it to the highest standard, getting it funded and connected, and looking after it for years is our job.

  1. 1

    We start with your meter data

    Your half-hourly import data from ESB Networks, your tariff and your connection size. It shows when you use power and where the peaks are, so the battery is sized for your site.

  2. 2

    We choose the optimal Sigenergy components for your site

    SigenStack or SigenStor, inverter sizes, how many battery modules, where they go and how they connect. You get the design and the reasoning in writing.

  3. 3

    We handle the grant and ESB Networks

    TAMS for farms or the SEAI non-domestic grant for everyone else, and the grid application ESB Networks needs for a system your size. Nothing is installed until both are in place.

  4. 4

    We install to the highest standard

    Our own registered electricians install, test and commission the system, planned around your milking, trading or production hours so the site keeps running.

  5. 5

    We monitor and look after it

    Remote monitoring in the Sigenergy platform, firmware and settings as your tariff or load changes, and more battery modules when you need them. We’re based in Athlone.

60%

Farms: TAMS grant-aids solar at 60% against a €90,000 ceiling, up to €54,000. Battery storage is eligible, up to 50% of the array’s size in kWp.

Agri Solar and TAMS

€325,200

Businesses and public buildings: the SEAI Non-Domestic Microgen Scheme pays up to €325,200 on the solar. The battery is not grant-aided under it, so we size it to pay its own way.

SEAI non-domestic grant

13.5%

On commercial and farm buildings, supply and installation is charged at 13.5% VAT, or 23% where the equipment is worth more than two-thirds of the contract. VAT-registered businesses and farmers can normally reclaim it.

ESB

The grant and the grid connection are two different processes. Your installer notifies ESB Networks using the NC6 form (microgeneration, up to 6 kVA single-phase / 11 kVA three-phase) or NC7 (mini-generation, above that and up to 17 kVA single-phase / 50 kVA three-phase). Larger systems go through ESB’s small-scale generation application. We submit that notification before installation, and it must be approved before we install.

Watch

Sigenergy at work, on farms and in business

The commercial films worth your time from Sigenergy’s YouTube channel. These are Sigenergy’s projects, not ours. Nothing loads from YouTube until you press play.

SigenStack, the commercial storage systemSigenergy’s introduction to the stack and how it scales.Film: Sigenergy
SigenStack on the farmGreen energy meets green agriculture.Film: Sigenergy
SigenStack for farming and business in SwedenStorage on working farms and commercial sites.Film: Sigenergy
A UK factory on SigenergyA Somerset manufacturer’s solar and storage, with its installer.Film: Sigenergy
Six layers of safetyHow each SigenStack module protects itself.Film: Sigenergy
The Sigen Energy GatewayBackup and control from a home to a large industrial site.Film: Sigenergy
Every kWh countsSigenergy’s commercial range in one film.Film: Sigenergy

Before you buy

What you should know before you buy

The things we tell our commercial customers at the start.

Start with the meter data

A commercial battery is sized from your half-hourly import data, not a rule of thumb. If you have a smart meter, ESB Networks can provide it; we read it before we suggest a size, and tell you plainly if storage would not pay on your site.

The grid connection comes first

Larger systems need ESB Networks’ agreement before they connect, and some sites are given an export cap. We make the application, design to whatever ESB Networks allows, and build the timeline around it.

It needs to stay online

Sigenergy’s ten-year commercial warranty depends on the system staying connected to Sigen Cloud. Offline for more than 6 months, it can drop back to the shorter basic term, so we design in a reliable connection from day one.

Backup is a separate job

Sigenergy’s commercial systems can be set up to keep chosen loads running in a power cut. That is extra design and safety work, not part of a standard install. If you need it, raise it at survey and it will be priced on its own.

Car-to-building: V2X-ready

SigenStor’s DC charging module is V2X-ready, built to let a compatible vehicle feed the site. Using it will require special grid connection arrangements and additional ESB Networks approvals, as well as a vehicle that supports it.

Ten years, extendable to 15

Connected to Sigen Cloud, SigenStack and the commercial inverters carry Sigenergy’s ten-year warranty in Europe. The inverters, battery controller and base can be extended by a further 5 years if bought in the first year after commissioning.

Sigenergy warranty terms (Europe)

Sigenergy manufacturer warranty for the commercial range
ProductManufacturer warranty
Sigen hybrid and PV inverters, 50 – 125 kW10 years connected to Sigen Cloud, 5 years if not
SigenStack battery modules, battery controller and base10 years connected to Sigen Cloud, 2 years if not
SigenStack battery performance60% of usable energy at 10 years, or 6,000 cycles at 0.5 C (4,200 above 0.5 C), whichever comes first
Sigen Business Energy Gateway2 years
Power sensor, communication module and accessories2 years
SigenStor three-phase controller and batteries10 years
Sigen EV DC charging module3 years

From Sigenergy’s Factory Limited Warranty for C&I Product (For Europe) and its SigenStor warranty for Europe, read 11 November 2026. Our own workmanship cover is set out on your quotation.

Sigenergy commercial

Common questions

The things farms and businesses ask us most about Sigenergy.

Does Lumen install Sigenergy commercial systems?

Yes. We design, install and commission Sigenergy’s full commercial range available in Ireland, including SigenStack battery storage, commercial inverters, SigenStor and EV charging, for farms, businesses and public buildings. We are an SEAI-registered solar PV company and a Safe Electric registered electrical contractor, based in Athlone.

Is a battery grant-aided for a farm?

Under TAMS, battery storage is eligible alongside the solar, capped at a capacity equal to 50% of the array’s rated size in kWp. The solar investment scheme pays 60% against a €90,000 ceiling, so up to €54,000. TAMS cannot be combined with the SEAI non-domestic grant for the same project.

Is a battery grant-aided for a business?

Not under the SEAI Non-Domestic Microgen Scheme: it grant-aids the solar only, up to €325,200. That is why we size a commercial battery to pay for itself through peak shaving, self-consumption and tariff shifting, and tell you if it would not.

How do you size a commercial battery?

From your half-hourly meter data, your tariff and your connection. We look at when the site imports, how high the peaks go, how much solar would be exported, and what an export cap would waste. The answer is a size in kW and kWh, with the reasons.

Do I need ESB Networks’ permission?

The grant and the grid connection are two different processes. Your installer notifies ESB Networks using the NC6 form (microgeneration, up to 6 kVA single-phase / 11 kVA three-phase) or NC7 (mini-generation, above that and up to 17 kVA single-phase / 50 kVA three-phase). Larger systems go through ESB’s small-scale generation application. We submit that notification before installation, and it must be approved before we install.

What warranty comes with SigenStack?

In Europe, Sigenergy warrants the SigenStack battery modules, controller and base, and the commercial inverters, for 10 years while the system is connected to Sigen Cloud (2 years on the battery and 5 on the inverters if it is not). The battery is also warranted to keep 60% of its usable energy at 10 years, or 6,000 cycles at 0.5 C, whichever comes first. The inverters, controller and base can be extended by 5 years, up to 15 in total, if bought in the first year.

Can we add capacity later?

Yes. Sigenergy’s systems are modular: battery modules can be added to a stack, and more stacks or inverters can be added in parallel. We leave room in the design for the growth you expect.

Can the system keep us running in a power cut?

Sigenergy’s commercial systems can be configured to keep chosen loads running when the grid goes down. It is extra design and safety work and not part of a standard install. If you need it, raise it at survey and it will be priced on its own.

How much does a commercial Sigenergy system cost?

It depends on the size, the site and the connection. We do not publish a price list. After a survey and a look at your meter data we send a written, itemised quote with the grant worked in.

Sigenergy with Lumen

See what Sigenergy would do for your site

Send us a recent bill and, if you have it, your half-hourly meter data. We’ll survey the site and send an itemised Sigenergy design and quote with the grant worked in. Or call us on (090) 640 0180.

Book a commercial surveyCall (090) 640 0180

Mon–Fri, 9am–5pm · Free site survey